Flex-i-Coat® Automatic Powder Coating System

Flex-i-Coat® is a system concept for automated powder coating in series production. Pretreatment, the powder coating booth, curing oven and conveyor system are planned as one integrated process.

The design is based on workpiece size, part mix, required throughput and your production workflow. Together, we determine the appropriate conveyor concept and level of automation.

Flex-i-Coat®

Automated powder coating systems

Flex-i-Coat® connects the stages of powder coating with a conveyor system tailored to your production. Depending on the application, power-and-free or continuous-loop conveyors can be considered, together with indexed or continuous pretreatment processes.

With wet-chemical pretreatment, workpieces are first cleaned and pretreated. Residual water is removed before powder application. The parts are then coated in the powder booth and the powder coating is cured in the curing oven.

The process sequence, conveyor technology and automation depend on the components, coating requirements and production volumes. From planning to installation, we coordinate these stages as a complete system concept.

View completed coating system projects.

Waschkammer Otto Lehmann
Automatische Pulverbeschichtungsanlage mit Fördertechnik in einer Produktionshalle

System components

Configured for your part mix and production volumes

Components are selected according to their role in the process:

Alongside workpiece size and part mix, colour changes, production volumes and the level of automation are relevant to the configuration. See our coating system module overview for more information.

Benefits for your production

Automated processes for your series production

  • Automated material flow: The conveyor system connects the stations in line with the planned production sequence.
  • Coordinated process stages: Pretreatment, drying, powder application and curing are designed together.
  • Designed for your production requirements: Part mix, quantities and the required level of automation determine the system concept.
  • Integration into your operation: Factory space, interfaces and access are considered during planning.

Achievable throughput, energy requirements and economic viability depend on the configuration and operation of the system. We assess these factors for your project.

Questions about system planning

What information do we need for planning?

Workpiece dimensions and weights, materials, part mix, production volumes and shift patterns form the basis. Please also provide details of colour changes, quality requirements, factory space and existing utility connections.

When is an automated system suitable?

Flex-i-Coat® is an option for series production with a coordinated material flow. We assess whether an automated or modular powder coating system is more suitable based on your part mix and production workflow. Our powder coating system selection guide compares the concepts in terms of workpieces, material flow and system design.

How can coating requirements be assessed in advance?

Coating trials at our technical centre can help establish sample parts and process requirements for the system design. We agree the scope and objectives of each trial for the project.

What determines the throughput of a powder coating system?

The required quantity per shift is assessed against part spacing, loading and unloading, and the necessary process times. Workpiece geometry and the coating application influence the arrangement of the parts. The automated conveyor system and drying and curing sections are considered together. Conveyor speed alone therefore does not define achievable production output.

How are colour changes considered in series production?

For planning, we need the range of colours, changeover frequency and typical batch sizes. Cleaning, powder supply and recovery are configured for these tasks. The sequence of production orders and available buffer capacity also affect the workflow. We determine the appropriate concept using your actual colour change requirements; a universal changeover time cannot be derived from these alone.

Automated coating in an existing building

Existing columns, transport routes and different workpieces must be considered together in layout planning. One documented example is the FLEX-i-COAT system at Plastcoat. The project report shows how automated coating and manual processing of larger parts were combined in an existing factory building.

Our production data and system layout checklist supports the initial discussion. It helps you describe workpieces, quantities, colour changes and site conditions in a structured way.

Enquire about a Flex-i-Coat® system for your series production.

Waschkammer Otto Lehmann

QIB Logo

Our powder coating and mechanical and wet-chemical pretreatment equipment can be configured to support coating processes aimed at the quality requirements of the following certification schemes:

Qualitätsgemeinschaft Industriebeschichtung e.V.

GSB International e.V.

QUALISTEELCOAT

QUALICOAT

GSB Logo

Qualicoat Logo

quali steel coat Logo

Have a question?

Get in touch with us.