Schachtel fits large-part powder coating into a confined space

At Schachtel Oberflächentechnik in Allstedt, the automatic line handled small series parts. Large work relied on a manual spray stand and external pretreatment, creating a bottleneck. Only 25 × 12 m was available beside the existing conveyor.

Metal components suspended on the Schachtel coating line
Project photograph from the original case study.

How the system works

MEEH fitted pretreatment, a combined drying and curing oven, a manual powder booth, a transfer bridge and buffers into that space. Process chemicals occupy an upper level. The wash booth turns through 45 degrees at the rear to keep an existing emergency exit accessible. Pretreatment accommodates steel, aluminium and galvanised parts.

An evaporator treats wastewater, while a loading area and lifting station connect handling with processing.

Project specifications

Workpiece envelope Up to 7,400 × 2,500 × 2,500 mm
Maximum weight 2 t
Available space 25 × 12 m
System JUMBO-COAT
Commissioned 30 June 2019

Project results

The line entered service on 30 June 2019. According to the report, Schachtel maintained throughput while reducing operation from three shifts to one and a half. This figure describes the production conditions at that site.

Project source

JOT 12/2019 — “Anlagenkonstruktion als Millimeterarbeit”. The figures describe the installation and operating conditions documented in the report.