Schachtel fits large-part powder coating into a confined space
At Schachtel Oberflächentechnik in Allstedt, the automatic line handled small series parts. Large work relied on a manual spray stand and external pretreatment, creating a bottleneck. Only 25 × 12 m was available beside the existing conveyor.

How the system works
MEEH fitted pretreatment, a combined drying and curing oven, a manual powder booth, a transfer bridge and buffers into that space. Process chemicals occupy an upper level. The wash booth turns through 45 degrees at the rear to keep an existing emergency exit accessible. Pretreatment accommodates steel, aluminium and galvanised parts.
An evaporator treats wastewater, while a loading area and lifting station connect handling with processing.
Project specifications
| Workpiece envelope | Up to 7,400 × 2,500 × 2,500 mm |
|---|---|
| Maximum weight | 2 t |
| Available space | 25 × 12 m |
| System | JUMBO-COAT |
| Commissioned | 30 June 2019 |
Project results
The line entered service on 30 June 2019. According to the report, Schachtel maintained throughput while reducing operation from three shifts to one and a half. This figure describes the production conditions at that site.
Project source
JOT 12/2019 — “Anlagenkonstruktion als Millimeterarbeit”. The figures describe the installation and operating conditions documented in the report.
Planning a coating system
When floor space is limited, use the layout and infrastructure checklist to record columns, access routes and buffer space before comparing system layouts.
Modular coating systems · Coating system modules · Discuss your project with MEEH

