HTM adds powder coating to its hot-dip galvanising services
HTM Feuerverzinkerei in Mühlhausen previously sent galvanised components to regional coaters. Packaging, transport and outside lead times all affected delivery. HTM converted an existing building to finish individual parts and a range of metals in-house.
How the system works
A blast booth with a movable platform complements washing. An electric transfer bridge takes suspended parts to the wash booth, combined dry-off and curing oven, and manual powder booth. The automatic washer can treat one wider or two narrow parts depending on loading. Pretreatment and rinsing sequences follow the substrate. Process chemicals are housed above the booths to save floor space.
Project specifications
| Workpiece envelope | Up to 6 × 1.5 × 2.5 m |
|---|---|
| Carrier load | 1 t |
| Application | Manual |
| Commissioned | 6 June 2019 |
| Additional equipment | Blast booth with movable platform |
Project results
The JUMBO-COAT system entered service on 6 June 2019. The report describes a new service that also supports the galvanising business. Its benefits were control over the process and a wider offering. The report does not quantify a throughput increase.
Project source
JOT 2/2020 — “Vom Feuerverzinken zum Pulverbeschichten”. The figures describe the installation and operating conditions documented in the report.
Planning a coating system
Modular coating systems · Coating system modules and buying guide · Discuss your project with MEEH

