Pretreatment Tunnels for Automatic Coating Systems

A FLEX-i-COAT pretreatment tunnel removes oils, grease, dust and residues before coating. The washing process prepares the surface for an adherent, consistent and durable powder coating and is coordinated with the subsequent production stages.

Pretreatment tailored to your workpieces

A continuous pretreatment tunnel carries workpieces through washing, rinsing and treatment zones on the conveyor. Stages are specified around material, contamination and the required coating result.

Oil, grease, dust and manufacturing residues can impair coating adhesion. Cleaning, rinsing and chemical pretreatment are therefore coordinated to prepare a consistent surface.

Design takes account of dimensions, materials, contamination, throughput, conveyor speed and installation space. Pretreatment is integrated with FLEX-i-COAT material flow before drying, powder application and curing.

Cleaning and degreasing before powder coating

Clean surfaces are the foundation for powder coating. Continuous washing removes oils, grease, dust and production residues before application. Cleaning and degreasing are coordinated with the material and coating requirements.

Integration into the FLEX-i-COAT conveyor line

The pretreatment tunnel forms part of FLEX-i-COAT material flow. It is coordinated with conveyors, dry-off, powder application and curing to establish a continuous process sequence.

Cleaning and degreasing before powder coating

Before powder application, oils, grease, dust, swarf and other production residues must be removed from the surface.

Components pass through washing and treatment zones designed for the material, contamination and coating requirement. Cleaning, degreasing, rinsing and chemical pretreatment can be combined as appropriate.

Nozzle layout, temperature, chemicals, residence time and water treatment are coordinated to provide a suitable basis for drying and powder coating.

Wash chamber at Otto Lehmann

Integration into the FLEX-i-COAT conveyor line

In FLEX-i-COAT installations, workpieces follow a coordinated sequence from pretreatment through drying to powder application and curing.

The tunnel is planned around conveyors, workpiece dimensions, throughput and building layout, limiting unnecessary intermediate storage, manual transfers and waiting time.

Pretreatment is considered as part of the complete line. Cleaning, degreasing, drying and application must work together for stable production.

Continuous pretreatment with a washing tunnel

Workpieces, treatment stages and conveyors are assessed together when planning a pretreatment tunnel. Zones must suit the material and intended production sequence.

Which pretreatment data do we need?

  • Materials and surfaces: steel, aluminium or galvanised parts, contamination and requirements for the finished coating.
  • Workpieces: maximum dimensions, weight, geometry and arrangement on carriers.
  • Production: throughput, batches, conveyor speed or indexing and available time.
  • Utilities and location: factory area, height, water and energy supplies, and water treatment.

What follows pretreatment?

Wash and rinse zones are coordinated with FLEX-i-COAT transport equipment. Pretreatment is followed by dry-off and application in the continuous-line powder coating booth.

Documented pretreatment projects

Dresel: FLEX-i-COAT for steel and aluminium (German) and Amazone: agricultural machinery components (German) illustrate project-specific equipment. The reported configurations relate to the materials and production requirements of those installations.

Explore automatic FLEX-i-COAT systems or discuss pretreatment and washing tunnels.

Contact us

If you are planning a powder coating system and would like professional advice, we will be happy to help. Contact us by telephone or use the contact form to discuss your requirements with our team.




    International contact

    Ulrich Meeh

    Ulrich Meeh

    Managing Director
    u.meeh@jumbo-coat.de

    Find your next role

    Explore our current vacancies.