Continuous Drying and Curing Equipment

A continuous dry-off oven removes moisture after pretreatment before workpieces proceed to powder application or the next stage. MEEH coordinates drying equipment with your automatic coating line and the required process conditions.

FLEX-i-COAT: continuous drying and curing

Drying after wet-chemical pretreatment and curing after powder application are separate thermal process tasks. In FLEX-i-COAT systems, they are coordinated with conveyors, indexing and layout.

What determines continuous drying equipment?

  • Workpieces: dimensions, weight, material, geometry and carrier loading.
  • Production: throughput, shifts, conveyor speed or indexing and buffers.
  • Process: condition after pretreatment, drying requirements, powder and specified curing conditions.
  • Integration: area, height, transport route, energy supplies, subsequent cooling and unloading.

Coordinating dryer and curing oven

Residence time, temperature and airflow are assessed alongside workpiece mass and material flow. Throughput must fit the processing times at other stations. Equipment is designed for the intended configuration.
Dresel: FLEX-i-COAT for steel and aluminium (German) illustrates an automatic sequence. Explore FLEX-i-COAT systems and general oven selection, or discuss continuous drying equipment.

Integration into an existing line

Assess the transport route, entry and exit heights and transfers to the conveyors. Available drying time must suit pretreatment and subsequent stages. Extensions also require assessment of control interfaces, energy supplies and maintenance access. Dimensions alone do not establish compatibility.

What does the cooling zone do?

Cooling is planned before unloading and subsequent operations. Workpiece mass, temperature profile and available time determine the required route or buffering. Explain how parts will be handled or processed afterwards. Dry-off, curing and cooling remain distinct process tasks.

Integrating the curing oven into the line

During curing, the applied powder is heated under specified conditions to form the finished coating. Temperature distribution and the workpiece temperature profile must be coordinated with the powder requirements when integrating a curing oven into FLEX-i-COAT.

Removing moisture after pretreatment

Workpieces must be appropriately dried after wet-chemical pretreatment and before powder application. The dry-off stage removes residual moisture and provides a suitable basis for coating.

Curing the powder coating

After application, powder is heated under controlled conditions to melt and cure into the finished surface. Temperature, residence time, airflow and workpiece mass must be coordinated.

In continuous lines, each component must receive the required thermal treatment during transit to achieve the specified adhesion, protection, surface quality and mechanical properties.

Insulation, heating, airflow and process controls are selected to limit energy losses and support stable production conditions.

The curing oven, powder booth and conveyors are integrated as a coordinated coating process.

Wash chamber at Otto Lehmann

Drying after wet-chemical pretreatment

Moisture may remain on surfaces, in recesses or at edges after cleaning, degreasing and wet-chemical treatment. This must be removed before powder application.

A continuous dry-off oven coordinates temperature, air volume, airflow and residence time with the component. Appropriate drying helps avoid moisture-related defects, including impaired adhesion, blistering and uneven surfaces.

Drying must fit the automatic material flow and be specified for workpiece size, weight, throughput and layout.

The aim is a suitable, consistent surface condition before subsequent powder application.

FLEX-i-COAT block dryers and cooling zones

MEEH continuous coating systems coordinate automated application, production rate and required coating quality.

FLEX-i-COAT block dryers and cooling zones draw on decades of Wieland Apparatebau experience and ongoing development. Equipment is planned around your workpieces and application requirements.

MEEH Save Energy Bundle

The MEEH Save Energy Bundle combines measures intended to reduce energy and resource use. Suitable measures and achievable results depend on the particular system and production programme.

Contact us

If you are planning a powder coating system and would like professional advice, we will be happy to help. Contact us by telephone or use the contact form to discuss your requirements with our team.




    International contact

    Ulrich Meeh

    Ulrich Meeh

    Managing Director
    u.meeh@jumbo-coat.de

    Find your next role

    Explore our current vacancies.