Plastcoat integrates FLEX-i-COAT into an existing factory

Dresden contract coater Plastcoat needed automated processing alongside manual finishing for larger work. Numerous columns restricted the layout, while different metals, long profiles and special parts placed different demands on the conveyor, pretreatment, oven and booths.

Orange conveyor and suspended components at Plastcoat
Project photograph from the original case study.

How the system works

MEEH lowered the pretreatment station and placed other equipment on an additional level. Seven-metre carriers move parts through the plant. A separate manual booth serves larger parts. Pretreatment sequences depend on the substrate, an evaporator treats water, and key process parameters are recorded. QR-based information and process visualisation help assign the correct operations.

Project specifications

Carrier length 7 m
Carrier load Up to 1,000 kg
Manual processing Up to 7,000 × 1,200 × 2,100 mm
System FLEX-i-COAT
Materials Steel, aluminium and galvanised parts

Project results

The project shows how a bespoke layout can extend the part range in an existing building. GSB certification was planned at the time of reporting. For a comparable project, a hall plan showing columns and access points helps define transfer interfaces, routes and cycle times before comparing offers.

Project source

MO — “Das Pulver immer neu erfinden”. The figures describe the installation and operating conditions documented in the report.

Planning a coating system

Automatic powder coating systems · Coating system modules and buying guide · Discuss your project with MEEH