Haslinger modernises a powder coating system with wood-chip heating
Haslinger had operated its original JUMBO-COAT system since 1995. The 2013 upgrade had to accommodate longer workpieces and bring pretreatment and the ovens into a new heating concept.

How the system works
The extension accommodates parts up to 13 m long. Two ovens and multiple carrier positions allow different processing sequences. A wood-chip heating system supplies the ovens, additional biomass boilers heat the building, and recovered process heat warms the pretreatment media.
Project specifications
| Workpiece envelope | Up to 13 × 2.5 × 3.5 m |
|---|---|
| System | Upgraded JUMBO-COAT |
| Upgrade | 2013 |
| Oven heat | Wood chips |
| Heat use | Pretreatment and building heating |
Project results
The report includes historical estimates for fuel oil, costs and carbon savings. Those calculations depend on the original comparison and prices. The documented outcome is an upgraded line combining a wider part range with biomass heat.
Project source
MO — “Mit Hackschnitzeln CO₂-neutral pulvern”. The figures describe the installation and operating conditions documented in the report.
Planning a coating system
Modular coating systems · Coating system modules and buying guide · Discuss your project with MEEH




