Haslinger modernises a powder coating system with wood-chip heating

Haslinger had operated its original JUMBO-COAT system since 1995. The 2013 upgrade had to accommodate longer workpieces and bring pretreatment and the ovens into a new heating concept.

Large metal components suspended on the Haslinger coating line
Project photograph from the original case study.

How the system works

The extension accommodates parts up to 13 m long. Two ovens and multiple carrier positions allow different processing sequences. A wood-chip heating system supplies the ovens, additional biomass boilers heat the building, and recovered process heat warms the pretreatment media.

Project specifications

Workpiece envelope Up to 13 × 2.5 × 3.5 m
System Upgraded JUMBO-COAT
Upgrade 2013
Oven heat Wood chips
Heat use Pretreatment and building heating

Project results

The report includes historical estimates for fuel oil, costs and carbon savings. Those calculations depend on the original comparison and prices. The documented outcome is an upgraded line combining a wider part range with biomass heat.

Project source

MO — “Mit Hackschnitzeln CO₂-neutral pulvern”. The figures describe the installation and operating conditions documented in the report.

Planning a coating system

Modular coating systems · Coating system modules and buying guide · Discuss your project with MEEH

Hennecke adds powder coating capacity for large parts and colour changes

Walter Th. Hennecke manufactures sheet metal components and assemblies for several industries. It wanted to bring finishing closer to fabrication, handle larger parts and expand its capacity for double coating.

Suspended white parts and yellow conveyor equipment at Hennecke
Project photograph from the original case study.

How the system works

A JUMBO-COAT batch system complements the existing power-and-free line. Large parts and frequent colour changes move to the new equipment, allowing the automatic line to run one colour range for longer. Transfer bridges connect the stations.

Project specifications

New system JUMBO-COAT
Existing equipment Power-and-free line
Installation began September 2017
Commissioned January 2018
Applications Large parts, colour changes and double coating

Project results

Installation began in September 2017 and production started in January 2018. The report describes multi-shift operation and support during installation and start-up. Hennecke reported better use of the automatic line and more flexibility for its own products. No quantified throughput increase or maximum dimensions were reported.

Project source

MEEH — “Oberflächen in allen Dimensionen behandeln”. The figures describe the installation and operating conditions documented in the report.

Planning a coating system

Modular coating systems · Coating system modules and buying guide · Discuss your project with MEEH

Doll installs a wet painting line for heavy vehicle components

Vehicle bodies and heavy assemblies need space for finishing and equipment that can move them safely between stations. Doll needed a line that could handle different workpieces as production requirements changed.

Manual painting of a large vehicle frame in the Doll wet painting booth
Project photograph from the original case study.

How the system works

The approximately 120 m line links handling, painting and drying. Friction-wheel drives assist the transfer of parts up to 15 m long and weighing up to seven tonnes.

Project specifications

Workpiece envelope Up to 15 × 3.5 × 3.5 m
Maximum weight 7 t
Line length Approximately 120 m
Process Wet painting
Project year 2008

Project results

The 2008 report documents wet painting in vehicle production. The design allowed for other processes, including powder coating, as future extensions. The report does not establish that these extensions entered service.

Project source

BESSER LACKIEREN — “Flexibel einsetzbare Lackierstraße als Überlebens- und Erfolgsstrategie”. The figures describe the installation and operating conditions documented in the report.

Planning a coating system

Modular coating systems · Coating system modules and buying guide · Discuss your project with MEEH

Stelzner powder coats sheet metal parts and machine enclosures

Stelzner makes components and enclosures for machine builders. Its mix of small and large parts needed flexible routes through the finishing process. The company introduced dry coating while retaining wet painting for selected applications.

Operator powder coating suspended sheet metal parts at Stelzner
Project photograph from the original case study.

How the system works

The JUMBO-COAT system combines cleaning, powder application and curing. The overhead tracks accommodate different part sizes, and pretreatment can be adapted to each workpiece. Recovered mixed powder can serve as primer on suitable jobs where colour is secondary.

Project specifications

System JUMBO-COAT
Products Sheet metal components and machine enclosures
Finish Powder coating with selected wet painting
Handling Flexible track system
Source Historical MO project report

Project results

The source reports faster processing than before. A three-year payback was an expectation at the time, rather than a measured outcome. The report gives no definitive maximum part dimensions.

Project source

MO — “Blechverarbeiter setzt auf Pulverlack”. The figures describe the installation and operating conditions documented in the report.

Planning a coating system

Modular coating systems · Coating system modules and buying guide · Discuss your project with MEEH

Seeger Lasertechnik brings sheet metal powder coating in-house

Customers increasingly wanted fully assembled, coated components. Seeger Lasertechnik in Lorsch wanted to supply the finish as well as fabricate the sheet metal and assemblies. Batch sizes varied, and the system had to fit the existing building.

The coating system

MEEH matched pretreatment, the powder booth and the oven to the way parts move through the plant. An overhead transfer system moves loads both lengthwise and sideways. The wash booth degreases, phosphates and rinses the parts before operators apply powder in a walk-in booth.

The case study describes the installation at the time of the report. Seeger also lists MEEH among its partners.

Project results

The 2017 trade report illustrates how a modular batch system can accommodate different orders. Part mix, the process stations and material flow all influenced the choice of equipment. Buyers comparing proposals for similar work should consider module selection, throughput and the scope of supply together.

Project source

blechnet, 16 January 2017 (German). Seeger’s partner directory. The figures describe the installation and operating conditions documented in the report.

Planning a coating system

Use the powder coating system planning checklist to specify your part mix and compare supplier quotations.

Modular coating systems · Coating system modules · Discuss your project with MEEH