Doll installs a wet painting line for heavy vehicle components
Vehicle bodies and heavy assemblies need space for finishing and equipment that can move them safely between stations. Doll needed a line that could handle different workpieces as production requirements changed.

How the system works
The approximately 120 m line links handling, painting and drying. Friction-wheel drives assist the transfer of parts up to 15 m long and weighing up to seven tonnes.
Project specifications
| Workpiece envelope | Up to 15 × 3.5 × 3.5 m |
|---|---|
| Maximum weight | 7 t |
| Line length | Approximately 120 m |
| Process | Wet painting |
| Project year | 2008 |
Project results
The 2008 report documents wet painting in vehicle production. The design allowed for other processes, including powder coating, as future extensions. The report does not establish that these extensions entered service.
Project source
BESSER LACKIEREN — “Flexibel einsetzbare Lackierstraße als Überlebens- und Erfolgsstrategie”. The figures describe the installation and operating conditions documented in the report.
Planning a coating system
Modular coating systems · Coating system modules and buying guide · Discuss your project with MEEH

