Bergmann powder coats heavy vehicle components in-house
Bergmann Maschinenbau previously sent parts out for powder coating. At Plant II the aim was better material flow, quality control and responsiveness for heavy components, small batches and changing colours.

How the system works
An electric transfer bridge links booths and buffers in an H-shaped layout. A lifting station assists with heavy work. A combined wet painting booth serves special parts. Operators wash large parts with a high-pressure lance, while an automatic spray frame handles smaller components. The manual powder booth is designed for frequent colour changes. Heat recovered from compressed-air generation warms the process water.
Project specifications
| Workpiece envelope | Up to 6 × 3 × 3 m |
|---|---|
| Maximum weight | 4,000 kg |
| System | JUMBO-COAT |
| Application | Manual |
| Additional equipment | Combined wet painting booth |
Project results
The report describes shorter lead times, greater flexibility and improved material flow at Plant II, which opened in 2012. In the multi-colour operation described, changeovers took no more than five minutes.
Project source
BESSER LACKIEREN, 2012 — “Bis zu 6 m lange Werkstücke flexibel mit Pulver beschichten”. The figures describe the installation and operating conditions documented in the report.
Planning a coating system
Modular coating systems · Coating system modules and buying guide · Discuss your project with MEEH

