Coating System Configurator.
Build a modular coating system concept and explore its space requirements.
Overhead conveyor · preliminary space study
Your clearance and rail rules are included. External dimensions still contain assumptions. Workpieces travel on an overhead conveyor within a freestanding steel structure. The model shows a concept, not confirmed technical feasibility.
STEP 01
How much space do you have?
Enter the available hall dimensions and clear height. All lengths are in metres.
Add a hall plan optional
Already have a hall outline? Attach a PDF, JPG or PNG up to 5 MB. The plan will be sent to MEEH with your enquiry. It does not alter the automatic sketch; please still enter the hall dimensions above.
No file selected. A hall plan is optional and is only uploaded when you send your enquiry.
Drag & drop the obstacle into the hall, then move it as needed. Alternatively, place it and enter its position numerically. Hall grid: 10 m. Origin: front left hall corner.
STEP 02
What would you like to coat?
Describe your largest workpiece and select the required processes. Length runs along the spur rail into the booth; width runs across it.
Process modules
Three dedicated spur rails at the right end of the parking area, preferably opposite pretreatment such as a blast cleaning or wash booth. Without pretreatment, loading is opposite another process module. Two continuous longitudinal beams form the steelwork. Cantilevers are loaded from the side. End columns stand below both beams at the opposite end of the parking area. At least 3.5 m of side space is provisionally reserved for forklift access; check the actual requirement against your forklift.
Parking area → transfer bridge → booths. The parking area stays opposite the booths.
70% refers to the rail field length from the first to the last axis. The gross count is rounded down to the 500 mm grid. Rails within portal clear strips are omitted, reducing the usable count. Rail pitch: 500 mm. The parking area also serves as a cooling area after the oven. Rail count is not a calculated capacity for occupied workpieces; cooling times and throughput still require planning.
Weight and quantity are recorded for your consultation. Load capacity and throughput are not yet calculated.
STEP 03
A first system concept.
Review the spatial layout. Dry-off and curing ovens are adjacent in the centre. The other modules and parking areas are arranged around them.
Planning rules based on your entries
Length along the spur rails · width across them
Workpieces, booths, parking rails and transfer bridge follow this orientation.
Booth internal (L × W): —
Workpiece dimension + 1 m on each side.
Example spur rail to booth: —
Transfer bridge length: —
Bridge: approx. 65% of workpiece length. The workpiece and its collision clearance remain unchanged. Spur rails include provisional connection dimensions.
Rail underside: —
Workpiece height + 0.50 m + 0.70 m.
3 rails per booth · 5 in the oven · 500 mm rail pitch
Workpiece envelope at the bridge (L × W): —
Workpiece footprint + 0.50 m clearance all round. The entire swept area is checked.
Steelwork: maximum 12 m column spacing
Intermediate portals stand at booth corners and extend to the outer parking edge. The opposing portal strip stays free of parking rails; runway ends have individual columns only. If there is no suitable booth corner, the plan is flagged as incomplete. Profiles and foundation dimensions are assumptions, not a structural design.
Loading/unloading: three dedicated spur rails at the right end of the parking area, preferably opposite pretreatment such as a blast cleaning or wash booth. Without pretreatment, loading is opposite another process module. Two longitudinal beams span the parking and loading areas. Side loading of cantilevers: at least 3.5 m of forklift space as a preliminary assumption. Additional hall space remains clear to the side. End columns support both beams at the opposite end of the parking row. Vertically moving rail sections connect to the parking rails. The upper transfer position is shown. Lift travel, structural connections and locking still require technical specification.
Provisional assumptions: wall thickness 0.20 m, profile depth 0.18 m, upper structural allowance 0.60 m, station spacing 1.20 m. External dimensions and steelwork require technical approval.What the concept checks
- Footprints within the hall
- Overlap with an obstacle
- Example clearances and clear height
Fire safety, escape routes, utilities, structural design, load capacity and achievable throughput are not checked. These require technical system planning.
STEP 04
From concept to conversation.
Send your system concept to MEEH and receive the same plan as a PDF with dimensioned 2D views.
Hall plan: not attached (optional).
Planning reference:
The contact form confirmed handover with the PDF attachment. Your PDF is downloading. If the download does not start, use the button. Receipt in the mailbox is not yet confirmed.
Your system concept in 3D
The entire system rotates with its conveyor equipment; the hall stays unchanged.
Drag the bridge handle to snap to booths and parking rails. Drag the workpiece in the required direction. Empty space: rotate view.